Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Cut the Drain Pipe

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Using a hacksaw or a dedicated PVC pipe cutter, carefully cut out the section of the drainpipe you marked. Make the cuts as straight and square as possible to ensure the new fitting will seat properly. After cutting, use a deburring tool or a utility knife to carefully remove any burrs or rough edges from the inside and outside of the cut ends of the pipe. A smooth surface is essential for a good solvent weld.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Cut the Drain Pipe

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Using a hacksaw or a dedicated PVC pipe cutter, carefully cut out the section of the drainpipe you marked. Make the cuts as straight and square as possible to ensure the new fitting will seat properly. After cutting, use a deburring tool or a utility knife to carefully remove any burrs or rough edges from the inside and outside of the cut ends of the pipe. A smooth surface is essential for a good solvent weld.

Videos for this step

Deburr and Clean Pipe EndsPipe Cutting and PreparationPrepare Pipe Ends

Tools and Materials

← Project

How to Install an Air Admittance Valve (AAV)

Step 3 of 7·1.4 hr left

Preparation and Safety
15 mins3 itemsBeginner
Mark the Cut Location
10 mins3 itemsIntermediate
3
Cut the Drain Pipe
15 mins4 itemsAdvanced
4
Install the Sanitary Tee
20 mins3 itemsAdvanced
5
Attach Vertical Vent Pipe
10 mins6 itemsIntermediate
6
Install the AAV
10 mins4 itemsBeginner
7
Testing for Leaks and Performance
30 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.