Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Mark the Cut Location

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Identify the correct location for the AAV. It must be installed on the horizontal drain arm between the P-trap and the wall connection. Crucially, the valve must be positioned at least 4 inches above the top of the horizontal drain arm. It also needs to be as high as practically possible under the sink, but still below the flood-level rim of the sink itself. Use a measuring tape and a marker to mark the section of the horizontal pipe where you will cut to install the new sanitary tee fitting. Ensure the marked section is long enough to accommodate the body of the tee.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Mark the Cut Location

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Identify the correct location for the AAV. It must be installed on the horizontal drain arm between the P-trap and the wall connection. Crucially, the valve must be positioned at least 4 inches above the top of the horizontal drain arm. It also needs to be as high as practically possible under the sink, but still below the flood-level rim of the sink itself. Use a measuring tape and a marker to mark the section of the horizontal pipe where you will cut to install the new sanitary tee fitting. Ensure the marked section is long enough to accommodate the body of the tee.

Videos for this step

Install Vanity Drain LinesReinstall P-TrapInstall Lavatory Drain Arm

Tools and Materials

← Project

How to Install an Air Admittance Valve (AAV)

Step 2 of 7·1.6 hr left

Preparation and Safety
15 mins3 itemsBeginner
2
Mark the Cut Location
10 mins3 itemsIntermediate
3
Cut the Drain Pipe
15 mins4 itemsAdvanced
4
Install the Sanitary Tee
20 mins3 itemsAdvanced
5
Attach Vertical Vent Pipe
10 mins6 itemsIntermediate
6
Install the AAV
10 mins4 itemsBeginner
7
Testing for Leaks and Performance
30 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.