Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Preparation and Safety

First, ensure your safety and prepare the work area. Clear everything from under the sink to give yourself ample room to work. Place a bucket or shallow pan directly under the P-trap and drain arm to catch any residual water when you disconnect the pipes. It's also wise to check local plumbing codes to confirm that AAVs are permitted in your area for this application.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Preparation and Safety

First, ensure your safety and prepare the work area. Clear everything from under the sink to give yourself ample room to work. Place a bucket or shallow pan directly under the P-trap and drain arm to catch any residual water when you disconnect the pipes. It's also wise to check local plumbing codes to confirm that AAVs are permitted in your area for this application.

Videos for this step

Disconnect Drain PipesPrepare Workspace and Remove P-TrapRemove the Old P-Trap

Tools and Materials

← Project

How to Install an Air Admittance Valve (AAV)

Step 1 of 7·1.8 hr left

1
Preparation and Safety
15 mins3 itemsBeginner
2
Mark the Cut Location
10 mins3 itemsIntermediate
3
Cut the Drain Pipe
15 mins4 itemsAdvanced
4
Install the Sanitary Tee
20 mins3 itemsAdvanced
5
Attach Vertical Vent Pipe
10 mins6 itemsIntermediate
6
Install the AAV
10 mins4 itemsBeginner
7
Testing for Leaks and Performance
30 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.