Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Waterproof Seams with Banding

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the final and most critical waterproofing step. In a bucket, mix unmodified thin-set mortar with water using a mixing paddle on your drill, following the manufacturer's ratio until it reaches a smooth, peanut butter-like consistency. Using a V-notch trowel, apply a layer of this thin-set over the entire seam where the niche flange meets the wallboard. Cut your waterproofing band (e.g., Kerdi-Band) to length, ensuring you have enough for a minimum 2-inch overlap at all corners and seams. Firmly press the waterproofing band into the wet mortar using the flat side of your trowel. Use firm pressure, moving from the center of the band outwards to squeeze out all air bubbles and excess mortar, ensuring full embedment. The texture of the band should be visible. Immediately apply a thin skim coat of mortar over the top of the band to fully encapsulate it. Let this cure completely (typically 24 hours) before beginning to tile.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Waterproof Seams with Banding

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This is the final and most critical waterproofing step. In a bucket, mix unmodified thin-set mortar with water using a mixing paddle on your drill, following the manufacturer's ratio until it reaches a smooth, peanut butter-like consistency. Using a V-notch trowel, apply a layer of this thin-set over the entire seam where the niche flange meets the wallboard. Cut your waterproofing band (e.g., Kerdi-Band) to length, ensuring you have enough for a minimum 2-inch overlap at all corners and seams. Firmly press the waterproofing band into the wet mortar using the flat side of your trowel. Use firm pressure, moving from the center of the band outwards to squeeze out all air bubbles and excess mortar, ensuring full embedment. The texture of the band should be visible. Immediately apply a thin skim coat of mortar over the top of the band to fully encapsulate it. Let this cure completely (typically 24 hours) before beginning to tile.

Videos for this step

Install Waterproofing CornersApply Thin-Set Over FlangeWall Membrane Installation

Tools and Materials

← Project

How to Install a Waterproof Foam Shower Niche

Step 6 of 6·almost done

Plan and Mark Location
20 mins5 itemsIntermediate
Frame the Opening
45 mins7 itemsAdvanced
Cut the Backer Board
15 mins9 itemsIntermediate
Install Board and Apply Sealant
30 mins6 itemsAdvanced
Set and Fasten Niche
15 mins4 itemsIntermediate
6
Waterproof Seams with Banding
1 min6 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.