Step 2 · Frame the Opening

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This step adds crucial rigidity. Measure the horizontal distance between the two vertical studs where the niche will be installed. Use a saw to cut two pieces of 2x4 lumber to this exact length; these will be your horizontal blocking. Position one block so its top edge aligns with your marked bottom cut line for the niche, and position the other block so its bottom edge aligns with your marked top cut line. Secure the blocks firmly by driving 3-inch wood screws through the vertical studs and into the ends of the blocks. The backer board and the niche flange will later be screwed into this solid wood framing.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Frame the Opening

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

This step adds crucial rigidity. Measure the horizontal distance between the two vertical studs where the niche will be installed. Use a saw to cut two pieces of 2x4 lumber to this exact length; these will be your horizontal blocking. Position one block so its top edge aligns with your marked bottom cut line for the niche, and position the other block so its bottom edge aligns with your marked top cut line. Secure the blocks firmly by driving 3-inch wood screws through the vertical studs and into the ends of the blocks. The backer board and the niche flange will later be screwed into this solid wood framing.

Videos for this step

Install Noggins (Blocking)Prepare Valve BlockingSecure Blocking and Set Shower Port

Tools and Materials

← Project

How to Install a Waterproof Foam Shower Niche

Step 2 of 6·1.8 hr left

Plan and Mark Location
20 mins5 itemsIntermediate
2
Frame the Opening
45 mins7 itemsAdvanced
3
Cut the Backer Board
15 mins9 itemsIntermediate
4
Install Board and Apply Sealant
30 mins6 itemsAdvanced
5
Set and Fasten Niche
15 mins4 itemsIntermediate
6
Waterproof Seams with Banding
1 min6 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.