Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Plan and Mark Location

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

First, decide on the final placement of your shower niche. A common height is chest-to-eye level, approximately 48 to 60 inches from the shower floor, for easy access. Use an electronic stud finder to locate the vertical studs in the wall bay where you plan to install the niche, as it must fit between them. Place the foam niche against the wall in your desired location. Use a level to ensure it is perfectly horizontal and trace the outer perimeter of its flange with a pencil. Next, measure the recessed box portion of the niche (the part that goes into the wall cavity) and carefully draw these cut-lines inside your first tracing. This inner line is the actual line you will cut.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Plan and Mark Location

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

First, decide on the final placement of your shower niche. A common height is chest-to-eye level, approximately 48 to 60 inches from the shower floor, for easy access. Use an electronic stud finder to locate the vertical studs in the wall bay where you plan to install the niche, as it must fit between them. Place the foam niche against the wall in your desired location. Use a level to ensure it is perfectly horizontal and trace the outer perimeter of its flange with a pencil. Next, measure the recessed box portion of the niche (the part that goes into the wall cavity) and carefully draw these cut-lines inside your first tracing. This inner line is the actual line you will cut.

Videos for this step

Install Wood BlockingPrepare the SubfloorChisel Out Wall Recesses

Tools and Materials

← Project

How to Install a Waterproof Foam Shower Niche

Step 1 of 6·2.1 hr left

1
Plan and Mark Location
20 mins5 itemsIntermediate
2
Frame the Opening
45 mins7 itemsAdvanced
3
Cut the Backer Board
15 mins9 itemsIntermediate
4
Install Board and Apply Sealant
30 mins6 itemsAdvanced
5
Set and Fasten Niche
15 mins4 itemsIntermediate
6
Waterproof Seams with Banding
1 min6 items