Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install Board and Apply Sealant

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Install the panel of waterproof backer board (with the hole already cut) onto the studs and blocking. Use the manufacturer-approved screws and washers, ensuring you follow their specified spacing pattern for a secure installation. Once the board is up, take your caulking gun and apply a continuous, unbroken bead of waterproof sealant (such as Schluter KERDI-FIX) to the exposed front edges of the horizontal blocking inside the opening. Immediately after, apply another continuous bead of the same sealant to the entire back perimeter of the niche's mounting flange.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Board and Apply Sealant

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Install the panel of waterproof backer board (with the hole already cut) onto the studs and blocking. Use the manufacturer-approved screws and washers, ensuring you follow their specified spacing pattern for a secure installation. Once the board is up, take your caulking gun and apply a continuous, unbroken bead of waterproof sealant (such as Schluter KERDI-FIX) to the exposed front edges of the horizontal blocking inside the opening. Immediately after, apply another continuous bead of the same sealant to the entire back perimeter of the niche's mounting flange.

Videos for this step

Waterproof Drain and CornersWaterproof Seams and CornersFinal Pan Installation and Securing

Tools and Materials

← Project

How to Install a Waterproof Foam Shower Niche

Step 4 of 6·46 min left

Plan and Mark Location
20 mins5 itemsIntermediate
Frame the Opening
45 mins7 itemsAdvanced
Cut the Backer Board
15 mins9 itemsIntermediate
4
Install Board and Apply Sealant
30 mins6 itemsAdvanced
5
Set and Fasten Niche
15 mins4 itemsIntermediate
6
Waterproof Seams with Banding
1 min6 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.