Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Test the Connection for Leaks

With the connection fully assembled and tightened, the final step is to test your work. If you turned off the main water supply, turn it back on now. Go to a fixture upstream from your repair (like a sink or toilet on the same floor or a floor above) and run a significant amount of water through the drain. While the water is running, carefully inspect the new connection at the coupling. Look closely at the top, sides, and especially the bottom for any signs of dripping or seepage. Wiping the joint with a dry paper towel is an excellent way to detect even the smallest leaks. If it remains dry, the job is complete.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Test the Connection for Leaks

With the connection fully assembled and tightened, the final step is to test your work. If you turned off the main water supply, turn it back on now. Go to a fixture upstream from your repair (like a sink or toilet on the same floor or a floor above) and run a significant amount of water through the drain. While the water is running, carefully inspect the new connection at the coupling. Look closely at the top, sides, and especially the bottom for any signs of dripping or seepage. Wiping the joint with a dry paper towel is an excellent way to detect even the smallest leaks. If it remains dry, the job is complete.

Videos for this step

Test for Leaks and FunctionalityRestore Water and Check for LeaksPerform Final Leak Check

Tools and Materials

← Project

How to Connect a PVC Drain to a Cast Iron Pipe

Step 9 of 9·10 min left

Safety and Preparation
15 mins6 itemsBeginner
Mark the Cut Lines
5 mins3 itemsBeginner
Support the Pipe
20 mins2 itemsAdvanced
Cut the Cast Iron Pipe
30 mins5 items
Clean and Deburr Pipe Ends
15 mins5 itemsIntermediate
Measure and Prepare PVC Pipe
10 mins4 itemsIntermediate
Install the Shielded Flexible Coupling
10 mins3 itemsIntermediate
Tighten the Coupling Bands to Spec
10 mins2 itemsAdvanced
9
Test the Connection for Leaks
10 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.