Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 1 · Safety and Preparation

Begin by preparing your work environment to ensure safety and cleanliness. Lay down a drop cloth to protect the floor from dust, debris, and water. As a safety precaution against unexpected water flow, it's wise to shut off the main water supply to the house. Don your personal protective equipment (PPE): safety glasses to protect your eyes from flying debris, heavy-duty gloves to protect your hands from sharp metal edges, and a dust mask or respirator to prevent inhalation of cast iron dust. Keep a bucket and rags nearby to manage any residual water or waste that may spill from the drainpipe once it's cut.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Safety and Preparation

Begin by preparing your work environment to ensure safety and cleanliness. Lay down a drop cloth to protect the floor from dust, debris, and water. As a safety precaution against unexpected water flow, it's wise to shut off the main water supply to the house. Don your personal protective equipment (PPE): safety glasses to protect your eyes from flying debris, heavy-duty gloves to protect your hands from sharp metal edges, and a dust mask or respirator to prevent inhalation of cast iron dust. Keep a bucket and rags nearby to manage any residual water or waste that may spill from the drainpipe once it's cut.

Videos for this step

Cut and Remove Old Cast Iron PipePrepare the Copper PipePrepare and Shut Off Water

Tools and Materials

← Project

How to Connect a PVC Drain to a Cast Iron Pipe

Step 1 of 9·2.1 hr left

1
Safety and Preparation
15 mins6 itemsBeginner
2
Mark the Cut Lines
5 mins3 itemsBeginner
3
Support the Pipe
20 mins2 itemsAdvanced
4
Cut the Cast Iron Pipe
30 mins5 items
5
Clean and Deburr Pipe Ends
15 mins5 itemsIntermediate
6
Measure and Prepare PVC Pipe
10 mins4 itemsIntermediate
7
Install the Shielded Flexible Coupling
10 mins3 itemsIntermediate
8
Tighten the Coupling Bands to Spec
10 mins2 itemsAdvanced
9
Test the Connection for Leaks
10 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.