Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Install the Shielded Flexible Coupling

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Take your shielded flexible coupling and confirm it is the correct transition size (e.g., 3" Cast Iron to 3" PVC). The outside diameters are different, so a specific transition coupling is required. Loosen the band clamps on the coupling with a nut driver or wrench. Slide the entire coupling assembly, including the metal shield and rubber gasket, completely onto one of the existing cast iron pipe ends. Next, fit the newly cut PVC pipe section into the gap, aligning its ends with the cast iron pipes. Finally, slide the flexible coupling back over the joint, positioning it so the rubber gasket is centered and covers both the PVC and cast iron pipe ends equally.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Install the Shielded Flexible Coupling

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Take your shielded flexible coupling and confirm it is the correct transition size (e.g., 3" Cast Iron to 3" PVC). The outside diameters are different, so a specific transition coupling is required. Loosen the band clamps on the coupling with a nut driver or wrench. Slide the entire coupling assembly, including the metal shield and rubber gasket, completely onto one of the existing cast iron pipe ends. Next, fit the newly cut PVC pipe section into the gap, aligning its ends with the cast iron pipes. Finally, slide the flexible coupling back over the joint, positioning it so the rubber gasket is centered and covers both the PVC and cast iron pipe ends equally.

Videos for this step

Secure and Tighten CouplingsInspect Transition ClampsPrepare Pipe Ends and Install Couplings

Tools and Materials

← Project

How to Connect a PVC Drain to a Cast Iron Pipe

Step 7 of 9·30 min left

Safety and Preparation
15 mins6 itemsBeginner
Mark the Cut Lines
5 mins3 itemsBeginner
Support the Pipe
20 mins2 itemsAdvanced
Cut the Cast Iron Pipe
30 mins5 items
Clean and Deburr Pipe Ends
15 mins5 itemsIntermediate
Measure and Prepare PVC Pipe
10 mins4 itemsIntermediate
7
Install the Shielded Flexible Coupling
10 mins3 itemsIntermediate
8
Tighten the Coupling Bands to Spec
10 mins2 itemsAdvanced
9
Test the Connection for Leaks
10 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.