Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 7 · Thorough Dust Removal

After the final sanding, dust is the enemy of a good finish. Start by vacuuming the entire floor thoroughly with a shop vacuum equipped with a brush attachment to capture as much dust as possible. Pay close attention to edges, corners, and any crevices. Follow up by wiping down all surfaces, including walls, baseboards, window frames, and any remaining furniture, with tack cloths. For very dusty environments or large areas, a leaf blower can be used to blow dust towards an open doorway or window, after which it should be thoroughly vacuumed and wiped down again. Ensure the air in the room is as dust-free as possible before applying any finish.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 7 · Thorough Dust Removal

After the final sanding, dust is the enemy of a good finish. Start by vacuuming the entire floor thoroughly with a shop vacuum equipped with a brush attachment to capture as much dust as possible. Pay close attention to edges, corners, and any crevices. Follow up by wiping down all surfaces, including walls, baseboards, window frames, and any remaining furniture, with tack cloths. For very dusty environments or large areas, a leaf blower can be used to blow dust towards an open doorway or window, after which it should be thoroughly vacuumed and wiped down again. Ensure the air in the room is as dust-free as possible before applying any finish.

Videos for this step

Thorough Dust RemovalClean DustThoroughly Clean and Remove All Dust

Tools and Materials

← Project

Hardwood Floor Refinishing

Step 7 of 12·82.5 hr left

Inspect and Clean the Floor
120 minutes6 items
Masking and Protection
90 minutes3 items
Rough Sanding (Drum Sander)
180 minutes3 items
Edging and Corner Sanding
120 minutes3 items
Intermediate Sanding (Buffer/Orbital Sander)
150 minutes2 items
Fine Sanding (Buffer/Orbital Sander)
120 minutes2 items
7
Thorough Dust Removal
180 minutes4 items
8
Stain Application (Optional)
120 minutes3 items
9
Apply First Coat of Finish
90 minutes2 items
10
Light Sanding Between Coats
60 minutes3 items
11
Apply Subsequent Coats of Finish
180 minutes4 items
12
Final Curing and Furniture Placement
4320 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.