Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 12 · Final Curing and Furniture Placement

After the final coat of finish has been applied and has dried to the touch, it requires a full curing period. This curing process hardens the finish and makes it durable. The time required for full curing varies significantly by product, but it typically ranges from 3 to 30 days. During this period, avoid heavy foot traffic, placing rugs, or moving furniture. Once the finish is fully cured, carefully place furniture back onto the floor. It is highly recommended to use felt pads or other protective furniture sliders under all furniture legs and moving objects to prevent scratches and dents.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 12 · Final Curing and Furniture Placement

After the final coat of finish has been applied and has dried to the touch, it requires a full curing period. This curing process hardens the finish and makes it durable. The time required for full curing varies significantly by product, but it typically ranges from 3 to 30 days. During this period, avoid heavy foot traffic, placing rugs, or moving furniture. Once the finish is fully cured, carefully place furniture back onto the floor. It is highly recommended to use felt pads or other protective furniture sliders under all furniture legs and moving objects to prevent scratches and dents.

Videos for this step

Allow Finish to CureFinal Curing and Room ResetFinal Inspection and Cure

Tools and Materials

← Project

Hardwood Floor Refinishing

Step 12 of 12·72 hr left

Inspect and Clean the Floor
120 minutes6 items
Masking and Protection
90 minutes3 items
Rough Sanding (Drum Sander)
180 minutes3 items
Edging and Corner Sanding
120 minutes3 items
Intermediate Sanding (Buffer/Orbital Sander)
150 minutes2 items
Fine Sanding (Buffer/Orbital Sander)
120 minutes2 items
Thorough Dust Removal
180 minutes4 items
Stain Application (Optional)
120 minutes3 items
Apply First Coat of Finish
90 minutes2 items
Light Sanding Between Coats
60 minutes3 items
Apply Subsequent Coats of Finish
180 minutes4 items
12
Final Curing and Furniture Placement
4320 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.