Step 6 · Seal All Joints and Connections

Apply a continuous bead of high-quality, exterior-grade gutter sealant to all areas where gutter sections connect, end caps are attached, and downspouts join the gutter outlets. Also, seal any joints between downspout sections if necessary. Smooth the sealant with a putty knife or gloved finger to create a clean, watertight seal. Allow the sealant to cure completely according to the manufacturer's instructions before exposing the gutters to heavy rain.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Seal All Joints and Connections

Apply a continuous bead of high-quality, exterior-grade gutter sealant to all areas where gutter sections connect, end caps are attached, and downspouts join the gutter outlets. Also, seal any joints between downspout sections if necessary. Smooth the sealant with a putty knife or gloved finger to create a clean, watertight seal. Allow the sealant to cure completely according to the manufacturer's instructions before exposing the gutters to heavy rain.

Videos for this step

Seal Gutter JointsSeal Leaks and Enhance Gutter AppearanceSeal Gutter Seams and End Caps

Tools and Materials

← Project

Gutter Installation

Step 6 of 7·1.3 hr left

Measure and Mark Gutter Layout
60 minutes4 items
Install Gutter Hangers (Brackets)
90 minutes5 items
Cut and Fit Gutters
120 minutes7 items
Mount Gutters
90 minutes5 items
Install Downspouts
100 minutes9 items
6
Seal All Joints and Connections
45 minutes4 items
7
Test the Gutter System
30 minutes4 items