Step 1 · Measure and Mark Gutter Layout

Measure the length of each section of the roof where gutters will be installed. Using a chalk line, mark a straight line along the fascia board or rafter tails to indicate the top edge of the gutter. Plan the placement of downspouts, typically at the ends of gutter runs or at corners, ensuring they align with existing drain pipes or splash block locations. Calculate the required slope for the gutters, generally a 1/4 inch drop for every 10 feet of gutter run, towards the downspout locations. Mark the high and low points for each gutter section.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 1 · Measure and Mark Gutter Layout

Measure the length of each section of the roof where gutters will be installed. Using a chalk line, mark a straight line along the fascia board or rafter tails to indicate the top edge of the gutter. Plan the placement of downspouts, typically at the ends of gutter runs or at corners, ensuring they align with existing drain pipes or splash block locations. Calculate the required slope for the gutters, generally a 1/4 inch drop for every 10 feet of gutter run, towards the downspout locations. Mark the high and low points for each gutter section.

Videos for this step

Mark Gutter Pitch LineDetermine and Mark Gutter SlopeMark Gutter Slope and Hanger Locations

Tools and Materials

← Project

Gutter Installation

Step 1 of 7·8.9 hr left

1
Measure and Mark Gutter Layout
60 minutes4 items
2
Install Gutter Hangers (Brackets)
90 minutes5 items
3
Cut and Fit Gutters
120 minutes7 items
4
Mount Gutters
90 minutes5 items
5
Install Downspouts
100 minutes9 items
6
Seal All Joints and Connections
45 minutes4 items
7
Test the Gutter System
30 minutes4 items