Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Mount Gutters

Carefully lift the cut and assembled gutter sections and place them into the gutter hangers. Ensure the top edge of the gutter aligns with the chalk line or the intended high point. For sectional gutters, secure them to the hangers using screws or clips as per the manufacturer's instructions. If using downspout outlets, ensure they are correctly positioned and sealed. Check that the slope is maintained towards the downspout locations.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Mount Gutters

Carefully lift the cut and assembled gutter sections and place them into the gutter hangers. Ensure the top edge of the gutter aligns with the chalk line or the intended high point. For sectional gutters, secure them to the hangers using screws or clips as per the manufacturer's instructions. If using downspout outlets, ensure they are correctly positioned and sealed. Check that the slope is maintained towards the downspout locations.

Videos for this step

Install Gutter on House and TestMount Gutters to FasciaFit Guttering Sections

Tools and Materials

← Project

Gutter Installation

Step 4 of 7·4.4 hr left

Measure and Mark Gutter Layout
60 minutes4 items
Install Gutter Hangers (Brackets)
90 minutes5 items
Cut and Fit Gutters
120 minutes7 items
4
Mount Gutters
90 minutes5 items
5
Install Downspouts
100 minutes9 items
6
Seal All Joints and Connections
45 minutes4 items
7
Test the Gutter System
30 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.