Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings
Project video

Step 10 · Turn on water supply and test

Slowly turn the hot and cold water shut-off valves counter-clockwise to restore the water supply. Turn on the faucet and let the water run for a minute, checking carefully for any leaks around the handle, spout, and under the sink. Turn the faucet off and observe for any drips.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 10 · Turn on water supply and test

Slowly turn the hot and cold water shut-off valves counter-clockwise to restore the water supply. Turn on the faucet and let the water run for a minute, checking carefully for any leaks around the handle, spout, and under the sink. Turn the faucet off and observe for any drips.

Tools and Materials

← Project

Faucet Repair

Step 10 of 10·5 min left

Turn off water supply
1 minute1 items
Open faucet to relieve pressure
1 minute
Disassemble faucet handle
5 minutes3 items
Remove retaining nut/clip
3 minutes2 items
Extract the faucet cartridge
2 minutes1 items
Clean the faucet body
3 minutes2 items
Insert the new faucet cartridge
2 minutes1 items
Reinstall retaining nut/clip
3 minutes2 items
Reassemble faucet handle
3 minutes2 items
10
Turn on water supply and test
5 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.