Step 6 · Apply the Second Coat of Sealant

Once the first coat is sufficiently dry, apply the second coat. It is generally recommended to apply the second coat perpendicular to the direction of the first coat. This helps to ensure a more uniform finish and better coverage, filling in any areas that may have been missed or were too thin in the first application. Use the same method (squeegee or brush) as the first coat, again maintaining a wet edge and working in thin, even layers. A second coat significantly enhances the protective qualities and appearance of the driveway.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Apply the Second Coat of Sealant

Once the first coat is sufficiently dry, apply the second coat. It is generally recommended to apply the second coat perpendicular to the direction of the first coat. This helps to ensure a more uniform finish and better coverage, filling in any areas that may have been missed or were too thin in the first application. Use the same method (squeegee or brush) as the first coat, again maintaining a wet edge and working in thin, even layers. A second coat significantly enhances the protective qualities and appearance of the driveway.

Videos for this step

Apply the Second Coat of SealerApply Second Coat of SealerFinal Coat and Appearance Assessment

Tools and Materials

← Project

Driveway Sealcoating

Step 6 of 7·75 hr left

Inspect and Clean the Driveway
120 minutes5 items
Repair Cracks and Potholes
90 minutes4 items
Mix the Sealant
30 minutes3 items
Apply the First Coat of Sealant
180 minutes3 items
Allow First Coat to Dry
360 minutes
6
Apply the Second Coat of Sealant
180 minutes3 items
7
Cure the Sealant
4320 minutes