Step 5 · Allow First Coat to Dry

The drying time for the first coat will vary depending on temperature, humidity, and sealant type. Typically, it will take between 4 to 12 hours for the first coat to be dry to the touch and ready for a second application. Avoid walking on the driveway during this period. Check the sealant manufacturer's recommendations for specific drying times between coats.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Allow First Coat to Dry

The drying time for the first coat will vary depending on temperature, humidity, and sealant type. Typically, it will take between 4 to 12 hours for the first coat to be dry to the touch and ready for a second application. Avoid walking on the driveway during this period. Check the sealant manufacturer's recommendations for specific drying times between coats.

Videos for this step

Dry the First CoatAllow to Dry and Cure

← Project

Driveway Sealcoating

Step 5 of 7·81 hr left

Inspect and Clean the Driveway
120 minutes5 items
Repair Cracks and Potholes
90 minutes4 items
Mix the Sealant
30 minutes3 items
Apply the First Coat of Sealant
180 minutes3 items
5
Allow First Coat to Dry
360 minutes
6
Apply the Second Coat of Sealant
180 minutes3 items
7
Cure the Sealant
4320 minutes