Step 4 · Apply the First Coat of Sealant

Begin applying the sealant at the highest point of the driveway and work your way down towards the street. Use a wide-edged squeegee or a stiff-bristled tar brush to spread the sealant. Maintain a wet edge to avoid lap marks. Apply the sealant in thin, even coats, ensuring complete coverage without leaving puddles or thick buildup. Work in manageable sections, especially if you are working alone. The goal is to get a uniform layer that fills minor surface imperfections and prepares the driveway for the second coat.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Apply the First Coat of Sealant

Begin applying the sealant at the highest point of the driveway and work your way down towards the street. Use a wide-edged squeegee or a stiff-bristled tar brush to spread the sealant. Maintain a wet edge to avoid lap marks. Apply the sealant in thin, even coats, ensuring complete coverage without leaving puddles or thick buildup. Work in manageable sections, especially if you are working alone. The goal is to get a uniform layer that fills minor surface imperfections and prepares the driveway for the second coat.

Videos for this step

Prepare and Apply SealerApply Sealer: Pour and Initial SpreadApply Sealer: Method 1 (All at Once)

Tools and Materials

← Project

Driveway Sealcoating

Step 4 of 7·84 hr left

Inspect and Clean the Driveway
120 minutes5 items
Repair Cracks and Potholes
90 minutes4 items
Mix the Sealant
30 minutes3 items
4
Apply the First Coat of Sealant
180 minutes3 items
5
Allow First Coat to Dry
360 minutes
6
Apply the Second Coat of Sealant
180 minutes3 items
7
Cure the Sealant
4320 minutes