Step 3 · Mix the Sealant

Refer to the instructions on the sealant container. Most asphalt sealants require mixing with water, sand, and sometimes other additives to achieve the correct consistency. Use a large mixing drum or bucket and a heavy-duty drill with a mixing paddle. Add the sealant, water, and any other specified components in the proportions recommended by the manufacturer. Mix thoroughly until a uniform, lump-free consistency is achieved. Avoid over-mixing, which can introduce too much air, or under-mixing, which can lead to an uneven application.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Mix the Sealant

Refer to the instructions on the sealant container. Most asphalt sealants require mixing with water, sand, and sometimes other additives to achieve the correct consistency. Use a large mixing drum or bucket and a heavy-duty drill with a mixing paddle. Add the sealant, water, and any other specified components in the proportions recommended by the manufacturer. Mix thoroughly until a uniform, lump-free consistency is achieved. Avoid over-mixing, which can introduce too much air, or under-mixing, which can lead to an uneven application.

Videos for this step

Final Cleaning and Sealer MixingPrepare Asphalt SealerMix the Asphalt Sealant

Tools and Materials

← Project

Driveway Sealcoating

Step 3 of 7·84.5 hr left

Inspect and Clean the Driveway
120 minutes5 items
Repair Cracks and Potholes
90 minutes4 items
3
Mix the Sealant
30 minutes3 items
4
Apply the First Coat of Sealant
180 minutes3 items
5
Allow First Coat to Dry
360 minutes
6
Apply the Second Coat of Sealant
180 minutes3 items
7
Cure the Sealant
4320 minutes