Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install Deck Posts

Cut deck posts to the required length, accounting for beam height and any necessary shimming. Attach the posts to the post anchors embedded in the footings using appropriate fasteners (e.g., bolts, structural screws). Use a level to ensure each post is perfectly plumb in two directions. Brace the posts temporarily to keep them stable during framing.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install Deck Posts

Cut deck posts to the required length, accounting for beam height and any necessary shimming. Attach the posts to the post anchors embedded in the footings using appropriate fasteners (e.g., bolts, structural screws). Use a level to ensure each post is perfectly plumb in two directions. Brace the posts temporarily to keep them stable during framing.

Videos for this step

Set and Cut Posts to HeightInstall Deck PostsCut and Set Deck Posts

Tools and Materials

← Project

Decking and Railing Installation

Step 4 of 10·31 hr left

Plan and Design the Deck
360 minutes5 items
Lay Out and Excavate Footings
240 minutes5 items
Pour Concrete Footings
180 minutes7 items
4
Install Deck Posts
120 minutes6 items
5
Install Beams
180 minutes5 items
6
Install Deck Joists
300 minutes10 items
7
Install Decking Boards
480 minutes8 items
8
Build and Install Railing Posts
240 minutes6 items
9
Install Top and Bottom Rails
180 minutes6 items
10
Install Balusters or Infill
360 minutes5 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.