Step 3 · Pour Concrete Footings

Place concrete forms (e.g., Sonotubes) or pour concrete directly into the excavated holes. Ensure the concrete is consolidated to eliminate air pockets. Insert post anchors into the wet concrete at the center of each footing, ensuring they are level and correctly positioned according to the plan. Allow concrete to cure completely.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Pour Concrete Footings

Place concrete forms (e.g., Sonotubes) or pour concrete directly into the excavated holes. Ensure the concrete is consolidated to eliminate air pockets. Insert post anchors into the wet concrete at the center of each footing, ensuring they are level and correctly positioned according to the plan. Allow concrete to cure completely.

Videos for this step

Pour Concrete Footings and Install AnchorsPour and Finish Concrete FootingsPour Concrete Footings

Tools and Materials

← Project

Decking and Railing Installation

Step 3 of 10·34 hr left

Plan and Design the Deck
360 minutes5 items
Lay Out and Excavate Footings
240 minutes5 items
3
Pour Concrete Footings
180 minutes7 items
4
Install Deck Posts
120 minutes6 items
5
Install Beams
180 minutes5 items
6
Install Deck Joists
300 minutes10 items
7
Install Decking Boards
480 minutes8 items
8
Build and Install Railing Posts
240 minutes6 items
9
Install Top and Bottom Rails
180 minutes6 items
10
Install Balusters or Infill
360 minutes5 items