Step 2 · Lay Out and Excavate Footings

Using the deck plan, precisely mark the locations for each footing. Dig holes for the footings, ensuring they extend below the local frost line to prevent heaving. The diameter of the holes should accommodate the footing form or concrete pier. Compact the soil at the bottom of each hole.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Lay Out and Excavate Footings

Using the deck plan, precisely mark the locations for each footing. Dig holes for the footings, ensuring they extend below the local frost line to prevent heaving. The diameter of the holes should accommodate the footing form or concrete pier. Compact the soil at the bottom of each hole.

Videos for this step

Dig Footing Holes and Set FormsMark and Dig Footing HolesLayout and Digging Footings

Tools and Materials

← Project

Decking and Railing Installation

Step 2 of 10·38 hr left

Plan and Design the Deck
360 minutes5 items
2
Lay Out and Excavate Footings
240 minutes5 items
3
Pour Concrete Footings
180 minutes7 items
4
Install Deck Posts
120 minutes6 items
5
Install Beams
180 minutes5 items
6
Install Deck Joists
300 minutes10 items
7
Install Decking Boards
480 minutes8 items
8
Build and Install Railing Posts
240 minutes6 items
9
Install Top and Bottom Rails
180 minutes6 items
10
Install Balusters or Infill
360 minutes5 items