Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Mount LED Strips and Controller

For LED light strips with an adhesive backing, ensure the mounting surface is clean, dry, and smooth. Remove the protective film from the adhesive and carefully press the strip into place, applying firm pressure along its entire length. If the adhesive is not sufficient, consider using mounting clips or double-sided tape designed for heavier-duty applications. For the controller, mount it in a convenient and accessible location, preferably near the power source and where the LED strips can be easily routed. Use screws, double-sided tape, or zip ties to secure the controller, ensuring it is stable and protected from damage.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Mount LED Strips and Controller

For LED light strips with an adhesive backing, ensure the mounting surface is clean, dry, and smooth. Remove the protective film from the adhesive and carefully press the strip into place, applying firm pressure along its entire length. If the adhesive is not sufficient, consider using mounting clips or double-sided tape designed for heavier-duty applications. For the controller, mount it in a convenient and accessible location, preferably near the power source and where the LED strips can be easily routed. Use screws, double-sided tape, or zip ties to secure the controller, ensuring it is stable and protected from damage.

Videos for this step

Mount the LED StripsMount the LED ControllerMount LED Strip and Consider Extrusion

Tools and Materials

← Project

How to Connect LED Light Strips to a Controller and Power Supply

Step 4 of 4·20 min left

Connect LED Strips to Controller
15 minutes6 items
Connect Controller to Power Supply
10 minutes3 items
Test the Lighting System
5 minutes2 items
4
Mount LED Strips and Controller
20 minutes8 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.