Step 4 · Construct Step Formwork (if using concrete)
If pouring a concrete step, construct a sturdy wooden form using 2x lumber (e.g., 2x8 or 2x10 depending on desired step height). The inside dimensions of the form should match the desired dimensions of the step. Secure the formwork to the ground using stakes and ensure it is level and plumb. The form should contain the wet concrete and provide the desired shape for the riser and tread.