Step 2 · Excavate for Step Foundation

Excavate the area marked in the previous step to a depth of at least 6-8 inches, or as required by local building codes for frost depth and stability. The excavation should be slightly larger than the planned step dimensions to allow for a gravel base and proper support. Ensure the bottom of the excavated area is as level as possible.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Excavate for Step Foundation

Excavate the area marked in the previous step to a depth of at least 6-8 inches, or as required by local building codes for frost depth and stability. The excavation should be slightly larger than the planned step dimensions to allow for a gravel base and proper support. Ensure the bottom of the excavated area is as level as possible.

Videos for this step

Excavating for the First StepDig Trench for First StepExcavate and Prepare the Sub-Base

Tools and Materials

← Project

How to Add a Step at a Too-High Back Door

Step 2 of 10·20.5 hr left

Determine Step Location and Dimensions
60 minutes5 items
2
Excavate for Step Foundation
120 minutes4 items
3
Install Gravel Base and Compact
90 minutes4 items
4
Construct Step Formwork (if using concrete)
180 minutes6 items
5
Pour and Finish Concrete Step
240 minutes9 items
6
Build Wooden Step Frame
180 minutes6 items
7
Install Step Frame and Ensure Stability
60 minutes4 items
8
Attach Step Treads and Risers
120 minutes4 items
9
Install Railings (if required or desired)
180 minutes8 items
10
Backfill and Landscape Around Step
60 minutes5 items