
How to Add a Step at a Too-High Back Door
About This Project
This project outlines the process of adding an exterior step to a back door that is too high off the ground, improving accessibility and safety.
Tools & Materials
Measuring Tape

Stinger

MARSHALLTOWN 1000 ft. White Twisted Mason's String Line 629
-Qwpwz94URBobujA1PYt2pgYiST5sMJ.webp)
Chalk Line

Level

Anvil 47 in. Wood Handle Carbon Steel Digging Shovel 77470-939
Measuring Tape
For accurate measurements of plywood and components, ensuring proper assembly.

Stinger
A stinger is a type of bar tool used in cocktail making and bartending. It is a long-handled utensil typically made of stainless steel, with a small disc-shaped end that is used to stir and mix ingredients in a cocktail glass. The stinger is an essential tool for creating perfectly mixed cocktails, as it allows bartenders to gently combine ingredients without disturbing the delicate balance of flavors. The stinger is particularly useful for cocktails that require a gentle touch, such as martinis or other stirred drinks. It is also commonly used to layer ingredients in a cocktail, creating visually appealing and distinct layers of flavor. The long handle of the stinger allows bartenders to reach the bottom of tall glasses or mixing glasses, ensuring that all ingredients are thoroughly mixed. One notable characteristic of the stinger is its versatility. While it is primarily used for stirring cocktails, it can also be used to muddle ingredients, such as herbs or fruit, in the bottom of a glass. This allows bartenders to extract maximum flavor from fresh ingredients, adding depth and complexity to their cocktails. In conclusion, the stinger is a versatile and essential tool for bartenders and cocktail enthusiasts alike. Its ability to gently mix ingredients, layer flavors, and muddle fresh ingredients makes it a valuable addition to any bar toolkit. Whether you are a professional bartender or a home mixologist, the stinger is sure to enhance your cocktail-making skills and elevate your drink creations to the next level.

MARSHALLTOWN 1000 ft. White Twisted Mason's String Line 629
This Marshalltown 1,000 ft. White Twisted Mason's String Line is ideal for staking out construction sites for concrete, brick, block or landscaping layouts. This rope isn't affected by mortar, oil and
-Qwpwz94URBobujA1PYt2pgYiST5sMJ.webp)
Chalk Line
Marks straight, precise lines on surfaces.

Level
Ensures surfaces are just right.

Anvil 47 in. Wood Handle Carbon Steel Digging Shovel 77470-939
Discover the Unparalleled Performance of the Anvil 47 in. Digging Shovel. Are you seeking a digging shovel that combines durability, strength, and reliable performance. Look no further than the Anvil Digging Shovel. Crafted with a laser-cut blade made of high-quality carbon steel, it effortlessly slices through soil, roots, and debris, making it an ideal tool for all your lawn and garden projects. What sets this shovel apart is the head, which is fully tempered for exceptional strength and durability. This means it can withstand the toughest digging tasks with ease and longevity. The 47 in. wood handle is not only functional but visually appealing as well, thanks to its varnished finish. This coating not only adds to its appearance but also provides protection against the elements, ensuring your shovel stays in top condition for years to come. This tool comes with a 5-year manufacturer warranty.
Steps
Determine Step Location and Dimensions
60 minutesMeasure the vertical distance from the bottom of the door threshold to the ground. This will determine the total rise needed for your step(s). Decide on the number of steps and their dimensions. A standard riser height is typically 7-8 inches, and a tread depth should be at least 10-12 inches. Mark the ground where the foundation for your step(s) will be located, ensuring it is level and extends slightly beyond the planned step dimensions. Use stakes and string lines to outline the area.
Watch: Determine Step DimensionsExcavate for Step Foundation
120 minutesExcavate the area marked in the previous step to a depth of at least 6-8 inches, or as required by local building codes for frost depth and stability. The excavation should be slightly larger than the planned step dimensions to allow for a gravel base and proper support. Ensure the bottom of the excavated area is as level as possible.
Watch: Excavating for the First StepInstall Gravel Base and Compact
90 minutesAdd a layer of crushed gravel (typically 3/4-inch minus) to the bottom of the excavation, to a depth of 4-6 inches. Spread the gravel evenly. Compact the gravel using a hand tamper or a plate compactor until it is firm and stable. This layer provides drainage and a solid base to prevent settling.
Watch: Install and Compact Gravel BaseConstruct Step Formwork (if using concrete)
180 minutesIf pouring a concrete step, construct a sturdy wooden form using 2x lumber (e.g., 2x8 or 2x10 depending on desired step height). The inside dimensions of the form should match the desired dimensions of the step. Secure the formwork to the ground using stakes and ensure it is level and plumb. The form should contain the wet concrete and provide the desired shape for the riser and tread.
Watch: Construct Stair FormsPour and Finish Concrete Step
240 minutesMix concrete according to the manufacturer's instructions, or order ready-mix concrete. Pour the concrete into the formwork, filling it completely. Use a screed board to level the concrete across the top of the form. Use a bull float to smooth the surface, then a hand float or trowel for a finer finish. Create a small chamfer along the edges to prevent chipping. Allow the concrete to cure properly, keeping it moist for several days.
Watch: Pour and Finish ConcreteBuild Wooden Step Frame
180 minutesCut pressure-treated lumber (e.g., 2x6 or 2x8 for risers and treads, 4x4 or 6x6 posts for support if needed) to the desired dimensions. Assemble the frame using exterior-grade screws. If building a multi-step unit, ensure the riser heights are consistent and the tread depths are adequate. The frame should sit securely on the compacted gravel base or concrete footing.
Watch: Construct the 2x6 Support FrameInstall Step Frame and Ensure Stability
60 minutesPosition the constructed wooden step frame onto the compacted gravel base or concrete footing. Check for levelness in all directions. Use shims if necessary to achieve a perfect level. If the step is tall or subject to significant use, consider anchoring it to the ground or to a nearby structure for added stability. Ensure there is no rocking or shifting.
Watch: Position and Level the Wooden StepAttach Step Treads and Risers
120 minutesAttach the tread boards to the top of the frame members using exterior-grade screws. Ensure the tread overhangs slightly for a finished look and ease of use. If building a closed riser step, attach riser boards between the treads. Ensure all pieces are flush with the frame and with each other where they meet. Check for any gaps or unevenness.
Watch: Installing Step Treads and RisersInstall Railings (if required or desired)
180 minutesIf your step is more than a single riser high, or if local codes require it, install sturdy handrails. Attach railing posts securely to the step frame or to separate footings. Ensure the posts are plumb and spaced appropriately for code requirements. Attach handrails to the posts at a height of 34-38 inches from the tread surface. Ensure the railing is strong and can support weight.
Watch: Attach HandrailBackfill and Landscape Around Step
60 minutesOnce the step structure is complete and stable, backfill any excavated areas around the base with soil, ensuring it is graded away from the step to promote drainage. You can also add gravel or mulch for a decorative finish. Ensure the area is tidy and safe.
Watch: Backfill and Level the Ground











