Step 3 · Install Gravel Base and Compact

Add a layer of crushed gravel (typically 3/4-inch minus) to the bottom of the excavation, to a depth of 4-6 inches. Spread the gravel evenly. Compact the gravel using a hand tamper or a plate compactor until it is firm and stable. This layer provides drainage and a solid base to prevent settling.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Install Gravel Base and Compact

Add a layer of crushed gravel (typically 3/4-inch minus) to the bottom of the excavation, to a depth of 4-6 inches. Spread the gravel evenly. Compact the gravel using a hand tamper or a plate compactor until it is firm and stable. This layer provides drainage and a solid base to prevent settling.

Videos for this step

Install and Compact Gravel BasePrepare the Stable BaseInstall and Compact Gravel Sub-Base

Tools and Materials

← Project

How to Add a Step at a Too-High Back Door

Step 3 of 10·18.5 hr left

Determine Step Location and Dimensions
60 minutes5 items
Excavate for Step Foundation
120 minutes4 items
3
Install Gravel Base and Compact
90 minutes4 items
4
Construct Step Formwork (if using concrete)
180 minutes6 items
5
Pour and Finish Concrete Step
240 minutes9 items
6
Build Wooden Step Frame
180 minutes6 items
7
Install Step Frame and Ensure Stability
60 minutes4 items
8
Attach Step Treads and Risers
120 minutes4 items
9
Install Railings (if required or desired)
180 minutes8 items
10
Backfill and Landscape Around Step
60 minutes5 items