Skip to main content

Backfill and Level the Ground — Backfill and Landscape Around Step

Beginner2 mins

Part of project

How to Add a Step at a Too-High Back Door · Step 10 of 10

Helpful?

In this video

After all timbers are installed, backfill the remaining excavated areas with soil. Use shovels to move soil into place and rakes to spread it evenly around and between the steps. The ground is then thoroughly watered with a hose to help settle the soil and eliminate air pockets, which prevents future settling and erosion. This ensures a clean and finished look.

6.5K views439
Transcript
Hide

have hit one of the screws at random you know okay yeah yeah okay then you will need one here somewhere yep gee thanks frank i got some stuff done today with your help thank you you're a hell of a guy frank for helping me yeah you are good one more you need to get that center one to fight like that and he had a loss without you he would he would come this way from this side of that hole there you miss right there that's okay at least they went in it's we did deep enough that's good okay that's that the side balls or the side chunks put it on oh no we gotta put the board up there yeah but they can go that you can fill them up into here and then uh above on that landing and stuff all the them chunks from that landing that way you can put them on the sides of it but don't don't bury the grip

Auto-generated transcript. May contain errors.