Skip to main content

Install New Newel Posts — Install Newel Posts

Intermediate7 mins

Part of project

How to Update a Split-Level Entry Staircase · Step 7 of 10

Helpful?

In this video

The newel posts are test-fitted first to ensure they slide on nicely. For permanent installation, PU (polyurethane) glue is applied generously to the stringer's tenon and surrounding floor joists. Pilot holes are drilled through the newel post and into the floor joists, and 75mm screws are driven in, countersunk to be flush. After each screw, the newel post's plumb is checked with a level. If the old stringer is twisted, temporary bracing with a level and clamps can be used to hold the newel post plumb while the glue dries. The posts are fixed to the floor upstairs by drilling through the side of the newel post into the floor joist and driving screws.

53.0K views914