Step 5 · Let the Primer Cure

Let those primed boards sit and dry thoroughly. Always check the can for the manufacturer's recommended dry times, and remember that humidity and temperature can change things. If you rush and paint over wet primer, you're just asking for trouble with your topcoat.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Let the Primer Cure

Let those primed boards sit and dry thoroughly. Always check the can for the manufacturer's recommended dry times, and remember that humidity and temperature can change things. If you rush and paint over wet primer, you're just asking for trouble with your topcoat.

← Project

Pre-painting Baseboards

Step 5 of 10·30.8 hr left

Initial Board Inspection
15 minutes
The First Sanding Pass
30 minutes
Dust Removal: Absolute Must
10 minutes
Apply a Quality Primer
45 minutes
5
Let the Primer Cure
120 minutes
6
The 'De-Nib' Sand
20 minutes
7
First Top Coat Application
45 minutes
8
Let the First Coat Dry
180 minutes
9
Applying the Final Coat
45 minutes
10
The Final Cure: Be Patient
1440 minutes