Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Fill Nail Holes and Gaps

Once all molding pieces are installed and the adhesive has cured, use wood filler to fill all visible nail holes. For gaps between the molding and the wall, or at mitered joints, use paintable caulk. Apply the wood filler and caulk smoothly. Allow the wood filler to dry completely, then lightly sand any excess until it is flush with the molding surface. Wipe away any sanding dust.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Fill Nail Holes and Gaps

Once all molding pieces are installed and the adhesive has cured, use wood filler to fill all visible nail holes. For gaps between the molding and the wall, or at mitered joints, use paintable caulk. Apply the wood filler and caulk smoothly. Allow the wood filler to dry completely, then lightly sand any excess until it is flush with the molding surface. Wipe away any sanding dust.

Videos for this step

Fill Nail HolesSeal Gaps and Fill Nail HolesFill Nail Holes

Tools and Materials

← Project

How to Install Chair Rail Along a Staircase

Step 8 of 9·3.8 hr left

Determine Chair Rail Height
30 minutes4 items
Prepare the Wall Surface
45 minutes5 items
Measure and Cut Molding for Straight Sections
60 minutes5 items
Measure and Cut Molding for Staircase Sections
90 minutes6 items
Test Fit the Molding
30 minutes2 items
Install the First Piece of Molding
45 minutes8 items
Continue Installation Around Staircase
120 minutes6 items
8
Fill Nail Holes and Gaps
45 minutes7 items
9
Paint or Finish the Molding
180 minutes9 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.