Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Prepare the Wall Surface

Before applying any molding, ensure the wall surface is clean, dry, and smooth. Wipe down the wall with a damp cloth to remove any dust, dirt, or grease. If there are any imperfections like holes or cracks, fill them with spackling paste and allow it to dry completely. Once dry, lightly sand the patched areas smooth. For optimal adhesion, lightly sand any glossy paint to create a better surface for the adhesive or caulk to grip.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Prepare the Wall Surface

Before applying any molding, ensure the wall surface is clean, dry, and smooth. Wipe down the wall with a damp cloth to remove any dust, dirt, or grease. If there are any imperfections like holes or cracks, fill them with spackling paste and allow it to dry completely. Once dry, lightly sand the patched areas smooth. For optimal adhesion, lightly sand any glossy paint to create a better surface for the adhesive or caulk to grip.

Videos for this step

Prepare the WallSand and Prime SurfacesPrepare the Wall Surface

Tools and Materials

← Project

How to Install Chair Rail Along a Staircase

Step 2 of 9·10.3 hr left

Determine Chair Rail Height
30 minutes4 items
2
Prepare the Wall Surface
45 minutes5 items
3
Measure and Cut Molding for Straight Sections
60 minutes5 items
4
Measure and Cut Molding for Staircase Sections
90 minutes6 items
5
Test Fit the Molding
30 minutes2 items
6
Install the First Piece of Molding
45 minutes8 items
7
Continue Installation Around Staircase
120 minutes6 items
8
Fill Nail Holes and Gaps
45 minutes7 items
9
Paint or Finish the Molding
180 minutes9 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.