Step 6 · Complete the Installation
Proceed with laying tiles, ensuring each new tile is butted tightly against its neighbors. Continue this process until the entire floor is covered. Pay close attention to alignment, especially in areas where multiple rows meet. After all tiles are laid, do a final inspection of the entire floor to ensure all edges are secure and there are no gaps. A final pass with a tile roller over the entire surface can help ensure maximum adhesion.
Tools and Materials
PrevNext