Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Apply Adhesive

Based on the carpet tile manufacturer's recommendations, select a suitable adhesive. If using a trowel-applied adhesive, use the recommended trowel size to spread a thin, even layer over a manageable section of the subfloor. Avoid applying adhesive to the entire floor at once, as it may dry out before tiles can be placed. For spray adhesives or adhesive strips, follow the specific product instructions.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Apply Adhesive

Based on the carpet tile manufacturer's recommendations, select a suitable adhesive. If using a trowel-applied adhesive, use the recommended trowel size to spread a thin, even layer over a manageable section of the subfloor. Avoid applying adhesive to the entire floor at once, as it may dry out before tiles can be placed. For spray adhesives or adhesive strips, follow the specific product instructions.

Videos for this step

Apply AdhesiveApply Subfloor AdhesiveApply New Adhesive

Tools and Materials

← Project

How to Install Carpet Tiles on a Landing or Loft

Step 3 of 6·4.2 hr left

Clean the Subfloor
60 minutes3 items
Measure and Plan Layout
45 minutes4 items
3
Apply Adhesive
30 minutes2 items
4
Install First Row of Tiles
40 minutes2 items
5
Cut Tiles for Edges and Obstacles
60 minutes5 items
6
Complete the Installation
120 minutes2 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.