Step 6 · Install Handrails and Guardrails
Following the manufacturer's instructions, attach the handrails to the sides of the alternating tread stair. Ensure they are installed at the correct height and provide a continuous gripping surface. If the installation area requires guardrails around the opening at the top of the stairs, install these as well, ensuring they meet local building code requirements for height and spacing.