Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Position and Secure Stair Top

Carefully maneuver the assembled alternating tread stair into the prepared opening. Position the top of the stair so that it aligns correctly with the floor or ceiling structure. Use the provided mounting brackets or appropriate fasteners (e.g., lag screws, bolts) to securely attach the top of the stair to the structural members. Ensure the stair is plumb and level.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Position and Secure Stair Top

Carefully maneuver the assembled alternating tread stair into the prepared opening. Position the top of the stair so that it aligns correctly with the floor or ceiling structure. Use the provided mounting brackets or appropriate fasteners (e.g., lag screws, bolts) to securely attach the top of the stair to the structural members. Ensure the stair is plumb and level.

Videos for this step

Install and Level the StairsSet Stairs into PlaceLift and Position Staircase into Place

Tools and Materials

← Project

How to Install an Alternating Tread Stair Kit

Step 4 of 7·2.8 hr left

Measure and Mark Opening Dimensions
30 minutes2 items
Cut the Opening
60 minutes5 items
Assemble Alternating Tread Stair Kit
90 minutes3 items
4
Position and Secure Stair Top
45 minutes5 items
5
Secure Stair Bottom
45 minutes4 items
6
Install Handrails and Guardrails
60 minutes6 items
7
Inspect and Test Stability
15 minutes
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.