Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Mark Bracket Positions

Refer to your specific retractable baby gate's installation manual for exact bracket placement guidelines. Typically, one bracket will be mounted on one side of the opening and the other on the opposite side. Use the measuring tape to ensure the distance between the marks corresponds to the gate's required width. Employ the level to confirm that the marks for each bracket are perfectly horizontal relative to each other. If mounting to a banister, ensure the marks are on a flat, stable section of the post.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Mark Bracket Positions

Refer to your specific retractable baby gate's installation manual for exact bracket placement guidelines. Typically, one bracket will be mounted on one side of the opening and the other on the opposite side. Use the measuring tape to ensure the distance between the marks corresponds to the gate's required width. Employ the level to confirm that the marks for each bracket are perfectly horizontal relative to each other. If mounting to a banister, ensure the marks are on a flat, stable section of the post.

Videos for this step

Mark Latching Side Bracket LocationsMark Gate Mount PositionsSecure Mounting Brackets (Side 2)

Tools and Materials

← Project

How to Install a Retractable Baby Gate on Stairs

Step 2 of 6·45 min left

Determine Gate Placement
15 minutes5 items
2
Mark Bracket Positions
10 minutes4 items
3
Drill Pilot Holes
5 minutes4 items
4
Mount the Brackets
15 minutes4 items
5
Attach the Gate Mechanism
10 minutes2 items
6
Test Gate Operation and Lock
5 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.