Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 3 · Install Top and Bottom Rails

Measure the distance between the installed railing posts. Cut the top and bottom railing boards to fit snugly. Attach the top rail to the tops of the posts using screws or specialized connectors. Attach the bottom rail at the appropriate height below the top rail, ensuring it is parallel and secure.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 3 · Install Top and Bottom Rails

Measure the distance between the installed railing posts. Cut the top and bottom railing boards to fit snugly. Attach the top rail to the tops of the posts using screws or specialized connectors. Attach the bottom rail at the appropriate height below the top rail, ensuring it is parallel and secure.

Videos for this step

Install Top and Bottom RailsInstall Top and Bottom RailsMeasure and Cut Top and Bottom Rails

Tools and Materials

← Project

How to Install a Deck Stair Railing

Step 3 of 6·3.3 hr left

Measure and Mark Stair Stringers
15 minutes3 items
Cut and Attach Railing Posts
45 minutes4 items
3
Install Top and Bottom Rails
60 minutes5 items
4
Install Balusters (Spindles)
90 minutes5 items
5
Attach Handrail
30 minutes4 items
6
Final Inspection and Safety Check
20 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.