Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Cut and Attach Railing Posts

Cut wooden posts for the railing to the appropriate height, typically from the base of the stringer to the marked railing height, plus extra for attachment. Using appropriate fasteners such as lag screws or structural screws, securely attach the posts to the stair stringers. Ensure posts are plumb and stable.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Cut and Attach Railing Posts

Cut wooden posts for the railing to the appropriate height, typically from the base of the stringer to the marked railing height, plus extra for attachment. Using appropriate fasteners such as lag screws or structural screws, securely attach the posts to the stair stringers. Ensure posts are plumb and stable.

Videos for this step

Install Stair Railing PostsInstall Newel Posts SecurelyInstall Stair Handrails and Cut Posts

Tools and Materials

← Project

How to Install a Deck Stair Railing

Step 2 of 6·4.1 hr left

Measure and Mark Stair Stringers
15 minutes3 items
2
Cut and Attach Railing Posts
45 minutes4 items
3
Install Top and Bottom Rails
60 minutes5 items
4
Install Balusters (Spindles)
90 minutes5 items
5
Attach Handrail
30 minutes4 items
6
Final Inspection and Safety Check
20 minutes1 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.