Step 9 · Testing the System

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before closing the walls, you must thoroughly test the new system for leaks. Double-check that all fixture shutoff valves and all individual ports on the manifold are in the closed position. Go to the main water shutoff valve and open it only about a quarter of the way. This allows the pipes to fill with water slowly, preventing a sudden pressure surge (water hammer) that could damage fittings. Listen for the sound of running water to stop, indicating the system is full. Then, fully open the main valve. With the system under full pressure, meticulously inspect every single connection you made. Use a flashlight and a dry paper towel to wipe each fitting and check for even the smallest amount of moisture. Let the system remain under pressure for several hours (or as required by your permit inspector) and perform another thorough inspection.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Testing the System

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before closing the walls, you must thoroughly test the new system for leaks. Double-check that all fixture shutoff valves and all individual ports on the manifold are in the closed position. Go to the main water shutoff valve and open it only about a quarter of the way. This allows the pipes to fill with water slowly, preventing a sudden pressure surge (water hammer) that could damage fittings. Listen for the sound of running water to stop, indicating the system is full. Then, fully open the main valve. With the system under full pressure, meticulously inspect every single connection you made. Use a flashlight and a dry paper towel to wipe each fitting and check for even the smallest amount of moisture. Let the system remain under pressure for several hours (or as required by your permit inspector) and perform another thorough inspection.

Videos for this step

System Overview and PreparationReconnect and RepressurizePressurize and Check for Leaks

Tools and Materials

← Project

How to Replace Grey Polybutylene Pipe with PEX

Step 9 of 10·12 min left

Planning and Permitting
4 mins8 itemsAdvanced
Shut Off Water and Drain System
30 mins1 itemsBeginner
Accessing the Pipes
2 mins4 itemsAdvanced
Removing Old Polybutylene Pipes
3 mins5 itemsAdvanced
Installing the PEX Manifold
1 min5 itemsIntermediate
Running New PEX Lines
6 mins9 items
Making Crimp Connections
4 mins6 items
Tying into the Main Supply
1 min7 items
9
Testing the System
4 mins3 itemsAdvanced
10
Drywall Repair and Finishing
8 mins9 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.