Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 5 · Installing the PEX Manifold

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Select a suitable location for your new PEX manifold, ensuring it is accessible for future maintenance. Mount a piece of 3/4-inch plywood to the wall studs to create a solid backing board. Use a level to position the manifold on the plywood and secure it firmly with screws. The manifold will have a main inlet for the hot water supply and another for the cold. Each fixture in your house will have its own dedicated port on both the hot and cold sides of the manifold, each controlled by a small ball valve.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 5 · Installing the PEX Manifold

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

Select a suitable location for your new PEX manifold, ensuring it is accessible for future maintenance. Mount a piece of 3/4-inch plywood to the wall studs to create a solid backing board. Use a level to position the manifold on the plywood and secure it firmly with screws. The manifold will have a main inlet for the hot water supply and another for the cold. Each fixture in your house will have its own dedicated port on both the hot and cold sides of the manifold, each controlled by a small ball valve.

Videos for this step

Run PEX Tubing Through FramingRun PEX Water LinesIdentify and Isolate Water Lines

Tools and Materials

← Project

How to Replace Grey Polybutylene Pipe with PEX

Step 5 of 10·24 min left

Planning and Permitting
4 mins8 itemsAdvanced
Shut Off Water and Drain System
30 mins1 itemsBeginner
Accessing the Pipes
2 mins4 itemsAdvanced
Removing Old Polybutylene Pipes
3 mins5 itemsAdvanced
5
Installing the PEX Manifold
1 min5 itemsIntermediate
6
Running New PEX Lines
6 mins9 items
7
Making Crimp Connections
4 mins6 items
8
Tying into the Main Supply
1 min7 items
9
Testing the System
4 mins3 itemsAdvanced
10
Drywall Repair and Finishing
8 mins9 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.