Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Remove Old Assembly and Dry-Fit the New One

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Once the slip nuts are disconnected and the drain flange is removed, the entire waste and overflow assembly is free. Carefully maneuver it out from behind the tub through the access panel opening. Take the old assembly and compare it to your new kit. Lay the new parts out next to the old ones. You may need to cut the new plastic pipes to match the length of the old ones. Use a hacksaw or a tubing cutter for this. Dry-fit the new assembly (without gaskets or putty) to ensure all lengths and angles are correct before proceeding.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Remove Old Assembly and Dry-Fit the New One

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Once the slip nuts are disconnected and the drain flange is removed, the entire waste and overflow assembly is free. Carefully maneuver it out from behind the tub through the access panel opening. Take the old assembly and compare it to your new kit. Lay the new parts out next to the old ones. You may need to cut the new plastic pipes to match the length of the old ones. Use a hacksaw or a tubing cutter for this. Dry-fit the new assembly (without gaskets or putty) to ensure all lengths and angles are correct before proceeding.

Videos for this step

Clean Up and Reconnect P-TrapClean and Prepare Drain AreaDisconnect Drain Plumbing

Tools and Materials

← Project

How to Replace a Pop-up Bathtub Drain and Overflow Assembly

Step 4 of 8·1.6 hr left

Remove the Overflow Plate and Linkage
10 mins2 itemsBeginner
Remove the Drain Flange
20 mins2 items
Disconnect the Old Assembly from Behind the Tub
15 mins3 itemsAdvanced
4
Remove Old Assembly and Dry-Fit the New One
25 mins3 itemsAdvanced
5
Install the New Drain Flange and Shoe
20 mins4 itemsAdvanced
6
Install Overflow Pipe and Connect to Main Drain
20 mins3 itemsIntermediate
7
Install and Adjust New Stopper and Linkage
15 mins1 itemsIntermediate
8
Test for Leaks
15 mins2 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.