Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Install the Replacement Section

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Slide a shielded mechanical coupling onto each end of the existing cast iron pipe, rolling back the rubber gasket. Position your new PVC pipe section into the gap. Unroll the rubber gaskets from the couplings over the ends of the PVC pipe, ensuring the pipe is centered within the coupling. Slide the metal shield over the rubber gasket and tighten the band clamps using a torque wrench or a nut driver. Tighten the bands incrementally and evenly to the torque specification printed on the coupling (usually 60 in-lbs). This ensures a firm, leak-proof seal.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Install the Replacement Section

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Slide a shielded mechanical coupling onto each end of the existing cast iron pipe, rolling back the rubber gasket. Position your new PVC pipe section into the gap. Unroll the rubber gaskets from the couplings over the ends of the PVC pipe, ensuring the pipe is centered within the coupling. Slide the metal shield over the rubber gasket and tighten the band clamps using a torque wrench or a nut driver. Tighten the bands incrementally and evenly to the torque specification printed on the coupling (usually 60 in-lbs). This ensures a firm, leak-proof seal.

Videos for this step

Install Main Drain ConnectionInstall Flexible Coupling on Tub DrainInstall and Connect the Valve

Tools and Materials

← Project

How to Replace a Cracked Cast Iron Drain Pipe with PVC

Step 9 of 11·1.1 hr left

Preparation and Safety
20 mins4 itemsBeginner
Support the Existing Pipe
30 mins5 itemsIntermediate
Mark the Cut Lines
10 mins2 itemsBeginner
Cut the Cast Iron Pipe
60 mins6 items
Remove the Damaged Section
15 mins3 itemsAdvanced
Clean and Prepare Pipe Ends
20 mins6 itemsIntermediate
Measure and Cut the PVC Pipe
15 mins5 itemsIntermediate
Assemble the New PVC Section (If Needed)
15 mins4 itemsIntermediate
9
Install the Replacement Section
30 mins5 itemsAdvanced
10
Test the Repair
15 mins3 itemsBeginner
11
Clean Up
20 mins3 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.