Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 9 · Test for Leaks

This is the final and most important check. Close the tub drain using the new trip-lever. Fill the tub with 3-4 inches of water, ensuring the water level is above the overflow opening gasket. With the access panel still open, use a flashlight and a dry paper towel to inspect every new connection for drips: the drain flange underside, the overflow gasket, and every slip nut joint. Let the water sit for 10-15 minutes. Afterwards, open the drain and inspect the connections again as the water flows out. If any leak is found, gently tighten the corresponding connection. If it persists, you may need to disassemble and re-seat that specific connection.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 9 · Test for Leaks

This is the final and most important check. Close the tub drain using the new trip-lever. Fill the tub with 3-4 inches of water, ensuring the water level is above the overflow opening gasket. With the access panel still open, use a flashlight and a dry paper towel to inspect every new connection for drips: the drain flange underside, the overflow gasket, and every slip nut joint. Let the water sit for 10-15 minutes. Afterwards, open the drain and inspect the connections again as the water flows out. If any leak is found, gently tighten the corresponding connection. If it persists, you may need to disassemble and re-seat that specific connection.

Videos for this step

Test the RepairCheck for LeaksTest and Check for Leaks

Tools and Materials

← Project

How to Replace a Bathtub Waste and Overflow Drain Assembly

Step 9 of 9·20 min left

Prepare the Work Area
15 mins3 itemsBeginner
Remove Overflow Cover and Stopper Linkage
10 mins1 itemsIntermediate
Remove the Drain Flange
20 mins1 items
Disconnect the Old Drain Assembly
20 mins2 itemsAdvanced
Clean All Connection Surfaces
15 mins3 itemsIntermediate
Dry-Fit the New Assembly
30 mins4 itemsAdvanced
Install the Drain Shoe and Overflow
30 mins4 itemsAdvanced
Make Final Connections
15 mins2 itemsIntermediate
9
Test for Leaks
20 mins4 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.