Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 8 · Make Final Connections

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

With the main components secured to the tub, connect the pipes. Attach the overflow tube between the overflow elbow and the top inlet of the waste tee. Thread the slip nuts and gaskets and tighten them by hand, followed by a final quarter-turn with channel-lock pliers. Connect the waste tee to the drain shoe in the same manner. Finally, connect the outlet of the waste tee to the house's sanitary drain line, ensuring the slip nut is tight. Once the pipes are connected, insert the new trip-lever linkage through the overflow plate, adjusting its length according to the manufacturer's instructions to ensure the stopper opens and closes correctly.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 8 · Make Final Connections

This is the step people usually slow down on. Go finger-tight first, then a quarter turn. No rush — replay the clip whenever it helps.

With the main components secured to the tub, connect the pipes. Attach the overflow tube between the overflow elbow and the top inlet of the waste tee. Thread the slip nuts and gaskets and tighten them by hand, followed by a final quarter-turn with channel-lock pliers. Connect the waste tee to the drain shoe in the same manner. Finally, connect the outlet of the waste tee to the house's sanitary drain line, ensuring the slip nut is tight. Once the pipes are connected, insert the new trip-lever linkage through the overflow plate, adjusting its length according to the manufacturer's instructions to ensure the stopper opens and closes correctly.

Videos for this step

Final Assembly and Leak TestReassemble and TestAssemble the P-Trap

Tools and Materials

← Project

How to Replace a Bathtub Waste and Overflow Drain Assembly

Step 8 of 9·35 min left

Prepare the Work Area
15 mins3 itemsBeginner
Remove Overflow Cover and Stopper Linkage
10 mins1 itemsIntermediate
Remove the Drain Flange
20 mins1 items
Disconnect the Old Drain Assembly
20 mins2 itemsAdvanced
Clean All Connection Surfaces
15 mins3 itemsIntermediate
Dry-Fit the New Assembly
30 mins4 itemsAdvanced
Install the Drain Shoe and Overflow
30 mins4 itemsAdvanced
8
Make Final Connections
15 mins2 itemsIntermediate
9
Test for Leaks
20 mins4 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.