Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 6 · Dry-Fit the New Assembly

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before using any sealants, test-fit the new assembly. Loosely connect the new overflow tube, waste tee, and drain shoe. Hold the entire assembly in place behind the tub, aligning the overflow elbow with the overflow hole and the drain shoe with the drain hole. Check the alignment of the waste tee outlet with the sanitary drain pipe. If the pipes are too long, mark the correct length and trim them with a hacksaw or tubing cutter. This step is critical to ensure all parts line up without stress.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Dry-Fit the New Assembly

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before using any sealants, test-fit the new assembly. Loosely connect the new overflow tube, waste tee, and drain shoe. Hold the entire assembly in place behind the tub, aligning the overflow elbow with the overflow hole and the drain shoe with the drain hole. Check the alignment of the waste tee outlet with the sanitary drain pipe. If the pipes are too long, mark the correct length and trim them with a hacksaw or tubing cutter. This step is critical to ensure all parts line up without stress.

Videos for this step

Install Drain Tailpiece on TubTest for LeaksFinal Assembly and Adjustments

Tools and Materials

← Project

How to Replace a Bathtub Waste and Overflow Drain Assembly

Step 6 of 9·1.6 hr left

Prepare the Work Area
15 mins3 itemsBeginner
Remove Overflow Cover and Stopper Linkage
10 mins1 itemsIntermediate
Remove the Drain Flange
20 mins1 items
Disconnect the Old Drain Assembly
20 mins2 itemsAdvanced
Clean All Connection Surfaces
15 mins3 itemsIntermediate
6
Dry-Fit the New Assembly
30 mins4 itemsAdvanced
7
Install the Drain Shoe and Overflow
30 mins4 itemsAdvanced
8
Make Final Connections
15 mins2 itemsIntermediate
9
Test for Leaks
20 mins4 itemsBeginner
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.