Step 6 · Backfill and Repair Floor

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

If you are using a backwater valve access box, place its sleeve over the valve now, ensuring the cover will be flush with the finished floor. Begin backfilling the hole with the previously excavated gravel or soil. Add the material in 4-6 inch layers, and use a hand tamper or a piece of 2x4 to compact each layer thoroughly. This prevents the ground from settling later and cracking your new concrete patch. Continue until you are about 4 inches from the top of the floor. Mix your ready-mix concrete in a wheelbarrow or mixing tub according to the package directions. Pour the mixed concrete into the hole, slightly overfilling it. Use a trowel to screed, level, and smooth the surface, making it flush with the existing basement floor. Let the concrete cure for at least 24-72 hours before walking on it.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 6 · Backfill and Repair Floor

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

If you are using a backwater valve access box, place its sleeve over the valve now, ensuring the cover will be flush with the finished floor. Begin backfilling the hole with the previously excavated gravel or soil. Add the material in 4-6 inch layers, and use a hand tamper or a piece of 2x4 to compact each layer thoroughly. This prevents the ground from settling later and cracking your new concrete patch. Continue until you are about 4 inches from the top of the floor. Mix your ready-mix concrete in a wheelbarrow or mixing tub according to the package directions. Pour the mixed concrete into the hole, slightly overfilling it. Use a trowel to screed, level, and smooth the surface, making it flush with the existing basement floor. Let the concrete cure for at least 24-72 hours before walking on it.

Videos for this step

Set Shower Base in ConcreteFill Pipe HolesPack Concrete Around Pipe

Tools and Materials

← Project

How to Install a Backwater Valve to Prevent Sewer Backups

Step 6 of 6·almost done

Planning, Permits, and Site Preparation
2 mins6 itemsIntermediate
Break Concrete and Excavate
2 mins6 items
Cut and Remove Pipe Section
30 mins10 items
Install the Backwater Valve
30 mins5 items
Inspection and Testing
1 min5 itemsBeginner
6
Backfill and Repair Floor
2 mins10 itemsAdvanced