Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 2 · Break Concrete and Excavate

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before starting, put on your personal protective equipment: safety glasses, heavy-duty gloves, steel-toed boots, and a dust mask or respirator. Using a demolition hammer (jackhammer) is most effective, but a sledgehammer and cold chisel will also work. Carefully break up the concrete within the marked area. Work from the center outwards to avoid cracking the surrounding floor. Remove the broken concrete pieces with a bucket. Once the concrete is removed, use a shovel to dig out the gravel, sand, and soil around the main drain pipe. You must excavate deep enough to fully expose the top, sides, and bottom of the pipe, providing enough clearance (at least 6-12 inches) to make cuts and install the new valve.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Break Concrete and Excavate

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

Before starting, put on your personal protective equipment: safety glasses, heavy-duty gloves, steel-toed boots, and a dust mask or respirator. Using a demolition hammer (jackhammer) is most effective, but a sledgehammer and cold chisel will also work. Carefully break up the concrete within the marked area. Work from the center outwards to avoid cracking the surrounding floor. Remove the broken concrete pieces with a bucket. Once the concrete is removed, use a shovel to dig out the gravel, sand, and soil around the main drain pipe. You must excavate deep enough to fully expose the top, sides, and bottom of the pipe, providing enough clearance (at least 6-12 inches) to make cuts and install the new valve.

Videos for this step

Prepare the Repair AreaSite Preparation and ExcavationLocate and Expose the Valve Cover

Tools and Materials

← Project

How to Install a Backwater Valve to Prevent Sewer Backups

Step 2 of 6·1.1 hr left

Planning, Permits, and Site Preparation
2 mins6 itemsIntermediate
2
Break Concrete and Excavate
2 mins6 items
3
Cut and Remove Pipe Section
30 mins10 items
4
Install the Backwater Valve
30 mins5 items
5
Inspection and Testing
1 min5 itemsBeginner
6
Backfill and Repair Floor
2 mins10 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.