Skip to main content
RR BuildingsRR Buildings
BrowseMy Projects
Log inSign up
RR Buildings

Step 4 · Install the Backwater Valve

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

First, perform a 'dry fit'. Assemble the backwater valve and two slip couplings onto the cut pipe ends without any primer or cement to ensure all parts align correctly and the valve sits level. Crucially, check the flow-direction arrow molded into the valve body; it MUST point away from the house and toward the street sewer. Once the fit is confirmed, disassemble the parts. Working one joint at a time, apply the purple PVC primer to the outside of the pipe end and the inside of the coupling. Immediately follow with a liberal application of PVC cement to both primed surfaces. Push the coupling onto the pipe with a quarter-turn twisting motion to spread the cement evenly. Hold firmly for 30 seconds. Repeat this process for the other pipe end and coupling. Finally, prime and cement the valve spigots and the open ends of the couplings, and push the valve firmly into place, again using a slight twist. Use a level to confirm the valve is not tilted.

Stesso home
SearchSearchBrowseBrowseMy ProjectsMy Projects
Log inLog inSign upSign up

Step 4 · Install the Backwater Valve

This is the step most people slow down on. Take it one move at a time — there’s no rush, and you can rewind the clip as many times as you need.

First, perform a 'dry fit'. Assemble the backwater valve and two slip couplings onto the cut pipe ends without any primer or cement to ensure all parts align correctly and the valve sits level. Crucially, check the flow-direction arrow molded into the valve body; it MUST point away from the house and toward the street sewer. Once the fit is confirmed, disassemble the parts. Working one joint at a time, apply the purple PVC primer to the outside of the pipe end and the inside of the coupling. Immediately follow with a liberal application of PVC cement to both primed surfaces. Push the coupling onto the pipe with a quarter-turn twisting motion to spread the cement evenly. Hold firmly for 30 seconds. Repeat this process for the other pipe end and coupling. Finally, prime and cement the valve spigots and the open ends of the couplings, and push the valve firmly into place, again using a slight twist. Use a level to confirm the valve is not tilted.

Videos for this step

Assemble and Glue Cleanout FittingsGlue and Install the PVC SystemPrepare and Glue New Pipe Section

Tools and Materials

← Project

How to Install a Backwater Valve to Prevent Sewer Backups

Step 4 of 6·33 min left

Planning, Permits, and Site Preparation
2 mins6 itemsIntermediate
Break Concrete and Excavate
2 mins6 items
Cut and Remove Pipe Section
30 mins10 items
4
Install the Backwater Valve
30 mins5 items
5
Inspection and Testing
1 min5 itemsBeginner
6
Backfill and Repair Floor
2 mins10 itemsAdvanced
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.